It's the same website, but the price is four times higher.
BlueCanvas Instant estimateIN website New production is divided into three classes: Below is the published price list, all excluding VAT.
| rating | amount |
|---|---|
| Basic type | 5 to 8 million won |
| standard type | 8 million ~ 13 million won |
| premium | 13 million ~ 20 million won |
If you compare the basic lower limit of 5 million won and the premium upper limit of 20 million won, it is four times higher. Comparing the lower limits, it is 2.6 times higher. Even though it is the same “website production,” let’s take the reason why it happens so much from the calculation rules.
Setting your price is just four questions
How much you write down in your budget does not determine the amount. Each answer is given points, and the grade is determined by the sum.
| question | low answer | high answer |
|---|---|---|
| number of pages | 0 points | +3 or +6 |
| design method | 0 points (template) | +3 (custom design) |
| Administrator function | 0 points (none) | +2 (yes) |
| multilingual | 0 points (Korean only) | +2 (multilingual) |
A total of 0 to 2 points is basic type, 3 to 7 points is standard type, and 8 points or more is premium type.
There is one combination that skips the score
There are exceptions. If you select administrator features and multiple languages together, you get a premium regardless of the score.This happens. Even for a five-page template site, 5 million won starts from 13 million won.
The reason is that the workload itself varies. If the content increases as the number of languages increases, and the administrator wants to manage the content by language, the data structure must be set differently from the beginning. The nature of this is different from creating a Korean website and then just adding translations.
There is one reason why we first reveal exceptions to our calculation rules. This is because the amount comes from conditions, not bargaining.
Amount added outside of production costs
If you only compare totals, you may miss some items. Costs other than production costs are also listed in the same table. Since the units are different, they do not add up.
| item | amount | unit |
|---|---|---|
| web hosting | 180,000 ~ 300,000 won | kite |
| website maintenance | 180,000 ~ 230,000 won | month |
| Case-by-case revision | 200,000 ~ 3 million won | items |
| Platform maintenance | 900,000 ~ 1.6 million won | month |
Four things to keep in mind when comparing quotes
If you receive a quote from each company that only lists the total amount, there is no comparison. You must set the four values below to the same value to get the amount under the same conditions.
- number of pages — How many screens are created?
- design method — Is it a template or a custom design?
- Administrator function — Is there a screen to edit directly?
- multilingual — How many languages are supported?
If you are considering the production method itself, Comparison of I’m Web, WordPress, and custom productionand website production cost analysisPlease take a look together. If you want to click on the conditions directly, Instant estimateYou can check the calculation results right away.